DOI

A market-oriented deterministic dynamic product recovery problem and its multi-echelon model formulation are discussed in this paper. For this general non-linear alternate deterministic dynamic product recovery model a dynamic programming solution procedure is developed. Furthermore, the subcases of the Just-in-time situation with regard to the suppliers as well as customers are considered, for which the two-stage problem is transformed to easily solvable one-stage models. It will be seen that the regarded recovery problem in this formulation is just a special multi-echelon problem with two alternative production options.

Язык оригиналаанглийский
Страницы (с-по)369-374
Число страниц6
ЖурналInternational Journal of Production Economics
Том81-82
DOI
СостояниеОпубликовано - 11 янв 2003
Опубликовано для внешнего пользованияДа

    Предметные области Scopus

  • Бизнес, управление и бухгалтерский учет (все)
  • Экономика и эконометрия
  • Теория управления и исследование операций
  • Промышленная технология и станкостроение

ID: 48975880