Standard

Pure and mixed strategies for the EOQ repair and waste disposal problem. / Richter, Knut.

In: OR Spectrum, Vol. 19, No. 2, 01.01.1997, p. 123-129.

Research output: Contribution to journalArticlepeer-review

Harvard

APA

Vancouver

Author

Richter, Knut. / Pure and mixed strategies for the EOQ repair and waste disposal problem. In: OR Spectrum. 1997 ; Vol. 19, No. 2. pp. 123-129.

BibTeX

@article{e44da0792a3048c293f81cd1d31eabba,
title = "Pure and mixed strategies for the EOQ repair and waste disposal problem",
abstract = "In this paper the analysis of the EOQ repair and waste disposal model with variable setup numbers for production and repair within some collection time interval is continued. The cost analysis is now extended to the extreme waste disposal rates and it is shown that the pure (bang-bang) policy of either no waste disposal (total repair) or no repair (total waste disposal) dominates the strategy of mixing waste disposal and repair. Moreover, the different behavior of the minimum cost, of the optimal setup numbers, lot sizes and collection intervals for small and large waste disposal rates is discussed.",
keywords = "Cost minimization, EOQ model, Production, Remanufacturing, Waste disposal",
author = "Knut Richter",
year = "1997",
month = jan,
day = "1",
doi = "10.1007/BF01545511",
language = "English",
volume = "19",
pages = "123--129",
journal = "Operations-Research-Spektrum",
issn = "0171-6468",
publisher = "Springer Nature",
number = "2",

}

RIS

TY - JOUR

T1 - Pure and mixed strategies for the EOQ repair and waste disposal problem

AU - Richter, Knut

PY - 1997/1/1

Y1 - 1997/1/1

N2 - In this paper the analysis of the EOQ repair and waste disposal model with variable setup numbers for production and repair within some collection time interval is continued. The cost analysis is now extended to the extreme waste disposal rates and it is shown that the pure (bang-bang) policy of either no waste disposal (total repair) or no repair (total waste disposal) dominates the strategy of mixing waste disposal and repair. Moreover, the different behavior of the minimum cost, of the optimal setup numbers, lot sizes and collection intervals for small and large waste disposal rates is discussed.

AB - In this paper the analysis of the EOQ repair and waste disposal model with variable setup numbers for production and repair within some collection time interval is continued. The cost analysis is now extended to the extreme waste disposal rates and it is shown that the pure (bang-bang) policy of either no waste disposal (total repair) or no repair (total waste disposal) dominates the strategy of mixing waste disposal and repair. Moreover, the different behavior of the minimum cost, of the optimal setup numbers, lot sizes and collection intervals for small and large waste disposal rates is discussed.

KW - Cost minimization

KW - EOQ model

KW - Production

KW - Remanufacturing

KW - Waste disposal

UR - http://www.scopus.com/inward/record.url?scp=0011755822&partnerID=8YFLogxK

U2 - 10.1007/BF01545511

DO - 10.1007/BF01545511

M3 - Article

AN - SCOPUS:0011755822

VL - 19

SP - 123

EP - 129

JO - Operations-Research-Spektrum

JF - Operations-Research-Spektrum

SN - 0171-6468

IS - 2

ER -

ID: 48976264