In this paper the analysis of the EOQ repair and waste disposal model with variable setup numbers for production and repair within some collection time interval is continued. The cost analysis is now extended to the extreme waste disposal rates and it is shown that the pure (bang-bang) policy of either no waste disposal (total repair) or no repair (total waste disposal) dominates the strategy of mixing waste disposal and repair. Moreover, the different behavior of the minimum cost, of the optimal setup numbers, lot sizes and collection intervals for small and large waste disposal rates is discussed.

Original languageEnglish
Pages (from-to)123-129
Number of pages7
JournalOR Spectrum
Volume19
Issue number2
DOIs
StatePublished - 1 Jan 1997
Externally publishedYes

    Scopus subject areas

  • Management Science and Operations Research

    Research areas

  • Cost minimization, EOQ model, Production, Remanufacturing, Waste disposal