The Nuclotron upgrade - the Nuclotron-M project, was successfully completed in 2010. Following the project goals, Xe ions were accelerated to about 1.5 GeV/u in March 2010. In December 2010, the stable and safe operation of the power supply and energy evacuation system was achieved with a field in the lattice magnets of 2 T. In 2011 - 2012 three runs of the Nuclotron operation were carried out. The facility development is aimed to the performance increase for current physical program realization and to test equipment and operational modes of the NICA collider.

Язык оригиналаанглийский
Страницы117-119
Число страниц3
СостояниеОпубликовано - 1 дек 2012
Событие23rd Russian Particle Accelerator Conference, RuPAC 2012 - Saint-Petersburg, Российская Федерация
Продолжительность: 24 сен 201228 сен 2012

конференция

конференция23rd Russian Particle Accelerator Conference, RuPAC 2012
Сокращенное названиеRuPAC 2012
Страна/TерриторияРоссийская Федерация
ГородSaint-Petersburg
Период24/09/1228/09/12

    Предметные области Scopus

  • Атомная и молекулярная физика и оптика

ID: 38124191