Standard

Start-up configuration of the NICA collider equipment. / Kozlov, O.; Meshkov, I.; Sidorin, A.; Trubnikov, G.

в: Physics of Particles and Nuclei Letters, Том 13, № 7, 01.12.2016, стр. 934-936.

Результаты исследований: Научные публикации в периодических изданияхстатьяРецензирование

Harvard

Kozlov, O, Meshkov, I, Sidorin, A & Trubnikov, G 2016, 'Start-up configuration of the NICA collider equipment', Physics of Particles and Nuclei Letters, Том. 13, № 7, стр. 934-936. https://doi.org/10.1134/S1547477116070347

APA

Vancouver

Author

Kozlov, O. ; Meshkov, I. ; Sidorin, A. ; Trubnikov, G. / Start-up configuration of the NICA collider equipment. в: Physics of Particles and Nuclei Letters. 2016 ; Том 13, № 7. стр. 934-936.

BibTeX

@article{f9571f3de6644dbfb2ecae31b5a2a02f,
title = "Start-up configuration of the NICA collider equipment",
abstract = "The start-up version of the NICA/MPD project is determined in accordance with the strategy of its staging. At the initial stage, the elements required for completing the BM@N experiment using an extracted beam and the test of MPD elements at a luminosity no less than 5 × 1025 cm–2 s–1 will be put into operation. The equipment configuration and strategy of the NICA collider operation during its commissioning are presented in this article.",
author = "O. Kozlov and I. Meshkov and A. Sidorin and G. Trubnikov",
year = "2016",
month = dec,
day = "1",
doi = "10.1134/S1547477116070347",
language = "English",
volume = "13",
pages = "934--936",
journal = "Physics of Particles and Nuclei Letters",
issn = "1547-4771",
publisher = "МАИК {"}Наука/Интерпериодика{"}",
number = "7",

}

RIS

TY - JOUR

T1 - Start-up configuration of the NICA collider equipment

AU - Kozlov, O.

AU - Meshkov, I.

AU - Sidorin, A.

AU - Trubnikov, G.

PY - 2016/12/1

Y1 - 2016/12/1

N2 - The start-up version of the NICA/MPD project is determined in accordance with the strategy of its staging. At the initial stage, the elements required for completing the BM@N experiment using an extracted beam and the test of MPD elements at a luminosity no less than 5 × 1025 cm–2 s–1 will be put into operation. The equipment configuration and strategy of the NICA collider operation during its commissioning are presented in this article.

AB - The start-up version of the NICA/MPD project is determined in accordance with the strategy of its staging. At the initial stage, the elements required for completing the BM@N experiment using an extracted beam and the test of MPD elements at a luminosity no less than 5 × 1025 cm–2 s–1 will be put into operation. The equipment configuration and strategy of the NICA collider operation during its commissioning are presented in this article.

UR - http://www.scopus.com/inward/record.url?scp=85002410263&partnerID=8YFLogxK

U2 - 10.1134/S1547477116070347

DO - 10.1134/S1547477116070347

M3 - Article

AN - SCOPUS:85002410263

VL - 13

SP - 934

EP - 936

JO - Physics of Particles and Nuclei Letters

JF - Physics of Particles and Nuclei Letters

SN - 1547-4771

IS - 7

ER -

ID: 43735858