Preliminary Monitoring and Route Location of Macro Energetic Project-Nord Stream 2 Marine Gas Pipeline. / Chusov, Alexander; Lednova, Julia; Shilin, Mikhail; Zhigulsky, Vladimir; Ershova, Alexandra.

IEEE 4th International Forum on Research and Technologies for Society and Industry, RTSI 2018 - Proceedings. Institute of Electrical and Electronics Engineers Inc., 2018. 8548418 (IEEE 4th International Forum on Research and Technologies for Society and Industry, RTSI 2018 - Proceedings).

Результаты исследований: Публикации в книгах, отчётах, сборниках, трудах конференцийстатья в сборнике материалов конференциинаучнаяРецензирование

Harvard

Chusov, A, Lednova, J, Shilin, M, Zhigulsky, V & Ershova, A 2018, Preliminary Monitoring and Route Location of Macro Energetic Project-Nord Stream 2 Marine Gas Pipeline. в IEEE 4th International Forum on Research and Technologies for Society and Industry, RTSI 2018 - Proceedings., 8548418, IEEE 4th International Forum on Research and Technologies for Society and Industry, RTSI 2018 - Proceedings, Institute of Electrical and Electronics Engineers Inc., 4th IEEE International Forum on Research and Technologies for Society and Industry, RTSI 2018, Palermo, Италия, 10/09/18. https://doi.org/10.1109/RTSI.2018.8548418

APA

Chusov, A., Lednova, J., Shilin, M., Zhigulsky, V., & Ershova, A. (2018). Preliminary Monitoring and Route Location of Macro Energetic Project-Nord Stream 2 Marine Gas Pipeline. в IEEE 4th International Forum on Research and Technologies for Society and Industry, RTSI 2018 - Proceedings [8548418] (IEEE 4th International Forum on Research and Technologies for Society and Industry, RTSI 2018 - Proceedings). Institute of Electrical and Electronics Engineers Inc.. https://doi.org/10.1109/RTSI.2018.8548418

Vancouver

Chusov A, Lednova J, Shilin M, Zhigulsky V, Ershova A. Preliminary Monitoring and Route Location of Macro Energetic Project-Nord Stream 2 Marine Gas Pipeline. в IEEE 4th International Forum on Research and Technologies for Society and Industry, RTSI 2018 - Proceedings. Institute of Electrical and Electronics Engineers Inc. 2018. 8548418. (IEEE 4th International Forum on Research and Technologies for Society and Industry, RTSI 2018 - Proceedings). https://doi.org/10.1109/RTSI.2018.8548418

Author

Chusov, Alexander ; Lednova, Julia ; Shilin, Mikhail ; Zhigulsky, Vladimir ; Ershova, Alexandra. / Preliminary Monitoring and Route Location of Macro Energetic Project-Nord Stream 2 Marine Gas Pipeline. IEEE 4th International Forum on Research and Technologies for Society and Industry, RTSI 2018 - Proceedings. Institute of Electrical and Electronics Engineers Inc., 2018. (IEEE 4th International Forum on Research and Technologies for Society and Industry, RTSI 2018 - Proceedings).

BibTeX

@inproceedings{75847de2bfc54f8199dfada9536eb774,
title = "Preliminary Monitoring and Route Location of Macro Energetic Project-Nord Stream 2 Marine Gas Pipeline",
abstract = "Nord Stream 2 Company carried out an Environmental Impact Assessment (EIA) to compare alternative location routes of the Russian part of the project Nord Stream 2 gas pipeline in April 2017 in Russia. Lengths of the alternative routes for new marine gas pipeline varied from 1230 km to 1260 km. During preliminary monitoring of natural and anthropogenic restrictions to construction and operation Nord Stream 2 for Narva route and Kolganpya route were observed. Preliminary Environmental Impact Assessment, realized for dredging and backfilling works, was made for planktonic and zoobenthos organisms, which are essential feeding resources for fish communities. N arva route was considered more appropriate taking into account some indicators of dredging and backfilling works and magnitude of impact on the environment.",
keywords = "dredging, marine biota, Nord Stream 2, preliminary monitoring, restriction",
author = "Alexander Chusov and Julia Lednova and Mikhail Shilin and Vladimir Zhigulsky and Alexandra Ershova",
year = "2018",
month = nov,
day = "26",
doi = "10.1109/RTSI.2018.8548418",
language = "English",
series = "IEEE 4th International Forum on Research and Technologies for Society and Industry, RTSI 2018 - Proceedings",
publisher = "Institute of Electrical and Electronics Engineers Inc.",
booktitle = "IEEE 4th International Forum on Research and Technologies for Society and Industry, RTSI 2018 - Proceedings",
address = "United States",
note = "4th IEEE International Forum on Research and Technologies for Society and Industry, RTSI 2018 ; Conference date: 10-09-2018 Through 13-09-2018",

}

RIS

TY - GEN

T1 - Preliminary Monitoring and Route Location of Macro Energetic Project-Nord Stream 2 Marine Gas Pipeline

AU - Chusov, Alexander

AU - Lednova, Julia

AU - Shilin, Mikhail

AU - Zhigulsky, Vladimir

AU - Ershova, Alexandra

PY - 2018/11/26

Y1 - 2018/11/26

N2 - Nord Stream 2 Company carried out an Environmental Impact Assessment (EIA) to compare alternative location routes of the Russian part of the project Nord Stream 2 gas pipeline in April 2017 in Russia. Lengths of the alternative routes for new marine gas pipeline varied from 1230 km to 1260 km. During preliminary monitoring of natural and anthropogenic restrictions to construction and operation Nord Stream 2 for Narva route and Kolganpya route were observed. Preliminary Environmental Impact Assessment, realized for dredging and backfilling works, was made for planktonic and zoobenthos organisms, which are essential feeding resources for fish communities. N arva route was considered more appropriate taking into account some indicators of dredging and backfilling works and magnitude of impact on the environment.

AB - Nord Stream 2 Company carried out an Environmental Impact Assessment (EIA) to compare alternative location routes of the Russian part of the project Nord Stream 2 gas pipeline in April 2017 in Russia. Lengths of the alternative routes for new marine gas pipeline varied from 1230 km to 1260 km. During preliminary monitoring of natural and anthropogenic restrictions to construction and operation Nord Stream 2 for Narva route and Kolganpya route were observed. Preliminary Environmental Impact Assessment, realized for dredging and backfilling works, was made for planktonic and zoobenthos organisms, which are essential feeding resources for fish communities. N arva route was considered more appropriate taking into account some indicators of dredging and backfilling works and magnitude of impact on the environment.

KW - dredging

KW - marine biota

KW - Nord Stream 2

KW - preliminary monitoring

KW - restriction

UR - http://www.scopus.com/inward/record.url?scp=85060030367&partnerID=8YFLogxK

U2 - 10.1109/RTSI.2018.8548418

DO - 10.1109/RTSI.2018.8548418

M3 - Conference contribution

AN - SCOPUS:85060030367

T3 - IEEE 4th International Forum on Research and Technologies for Society and Industry, RTSI 2018 - Proceedings

BT - IEEE 4th International Forum on Research and Technologies for Society and Industry, RTSI 2018 - Proceedings

PB - Institute of Electrical and Electronics Engineers Inc.

T2 - 4th IEEE International Forum on Research and Technologies for Society and Industry, RTSI 2018

Y2 - 10 September 2018 through 13 September 2018

ER -

ID: 50057257