In this paper, we consider a network whose nodes are regions between which it is necessary to distribute electricity coming from its source. Any power plant is a complex economic system that always combines simple concepts-the need to supply the power plant with the main resource for the production of electricity and the need to sell the generated electricity. In this model, due to the need to sell electricity to two regions, the prices for the sale of electricity do not matter. Profit maximization is achieved by minimizing production costs. The optimal policy for generating electricity in the i-th time period is found.

Язык оригиналаанглийский
Номер статьи012036
ЖурналIOP Conference Series: Materials Science and Engineering
Том873
Номер выпуска1
DOI
СостояниеОпубликовано - 7 июл 2020
Событие1st International Conference on Innovative Informational and Engineering Technologies, IIET 2020 - Stavropol, Российская Федерация
Продолжительность: 28 мая 202029 мая 2020

    Предметные области Scopus

  • Материаловедение (все)
  • Технология (все)

ID: 62501701