Standard

Status of the nuclotron. / Sidorin, A.; Agapov, N.; Alfeev, A.; Batin, V.; Brovko, O.; Butenko, A.; Donets, D. E.; Donets, E. D.; Donets, E. E.; Eliseev, A.; Fimushkin, V.; Galimov, A.; Karpinsky, V.; Kekelidze, V.; Khodzhibagiyan, H.; Kobets, A.; Meshkov, I.; Monchinsky, V.; Philippov, A.; Rukoyatkina, T.; Shurkhno, N.; Slepnev, V.; Slepnev, V.; Sorin, A.; Tuzikov, A.; Vasilishin, B.

2012. 117-119 Paper presented at 23rd Russian Particle Accelerator Conference, RuPAC 2012, Saint-Petersburg, Russian Federation.

Research output: Contribution to conferencePaperpeer-review

Harvard

Sidorin, A, Agapov, N, Alfeev, A, Batin, V, Brovko, O, Butenko, A, Donets, DE, Donets, ED, Donets, EE, Eliseev, A, Fimushkin, V, Galimov, A, Karpinsky, V, Kekelidze, V, Khodzhibagiyan, H, Kobets, A, Meshkov, I, Monchinsky, V, Philippov, A, Rukoyatkina, T, Shurkhno, N, Slepnev, V, Slepnev, V, Sorin, A, Tuzikov, A & Vasilishin, B 2012, 'Status of the nuclotron', Paper presented at 23rd Russian Particle Accelerator Conference, RuPAC 2012, Saint-Petersburg, Russian Federation, 24/09/12 - 28/09/12 pp. 117-119.

APA

Sidorin, A., Agapov, N., Alfeev, A., Batin, V., Brovko, O., Butenko, A., Donets, D. E., Donets, E. D., Donets, E. E., Eliseev, A., Fimushkin, V., Galimov, A., Karpinsky, V., Kekelidze, V., Khodzhibagiyan, H., Kobets, A., Meshkov, I., Monchinsky, V., Philippov, A., ... Vasilishin, B. (2012). Status of the nuclotron. 117-119. Paper presented at 23rd Russian Particle Accelerator Conference, RuPAC 2012, Saint-Petersburg, Russian Federation.

Vancouver

Sidorin A, Agapov N, Alfeev A, Batin V, Brovko O, Butenko A et al. Status of the nuclotron. 2012. Paper presented at 23rd Russian Particle Accelerator Conference, RuPAC 2012, Saint-Petersburg, Russian Federation.

Author

Sidorin, A. ; Agapov, N. ; Alfeev, A. ; Batin, V. ; Brovko, O. ; Butenko, A. ; Donets, D. E. ; Donets, E. D. ; Donets, E. E. ; Eliseev, A. ; Fimushkin, V. ; Galimov, A. ; Karpinsky, V. ; Kekelidze, V. ; Khodzhibagiyan, H. ; Kobets, A. ; Meshkov, I. ; Monchinsky, V. ; Philippov, A. ; Rukoyatkina, T. ; Shurkhno, N. ; Slepnev, V. ; Slepnev, V. ; Sorin, A. ; Tuzikov, A. ; Vasilishin, B. / Status of the nuclotron. Paper presented at 23rd Russian Particle Accelerator Conference, RuPAC 2012, Saint-Petersburg, Russian Federation.3 p.

BibTeX

@conference{f1195dce4a2b437da255217cdf5b25de,
title = "Status of the nuclotron",
abstract = "The Nuclotron upgrade - the Nuclotron-M project, was successfully completed in 2010. Following the project goals, Xe ions were accelerated to about 1.5 GeV/u in March 2010. In December 2010, the stable and safe operation of the power supply and energy evacuation system was achieved with a field in the lattice magnets of 2 T. In 2011 - 2012 three runs of the Nuclotron operation were carried out. The facility development is aimed to the performance increase for current physical program realization and to test equipment and operational modes of the NICA collider.",
author = "A. Sidorin and N. Agapov and A. Alfeev and V. Batin and O. Brovko and A. Butenko and Donets, {D. E.} and Donets, {E. D.} and Donets, {E. E.} and A. Eliseev and V. Fimushkin and A. Galimov and V. Karpinsky and V. Kekelidze and H. Khodzhibagiyan and A. Kobets and I. Meshkov and V. Monchinsky and A. Philippov and T. Rukoyatkina and N. Shurkhno and V. Slepnev and V. Slepnev and A. Sorin and A. Tuzikov and B. Vasilishin",
year = "2012",
month = dec,
day = "1",
language = "English",
pages = "117--119",
note = "23rd Russian Particle Accelerator Conference, RuPAC 2012, RuPAC 2012 ; Conference date: 24-09-2012 Through 28-09-2012",

}

RIS

TY - CONF

T1 - Status of the nuclotron

AU - Sidorin, A.

AU - Agapov, N.

AU - Alfeev, A.

AU - Batin, V.

AU - Brovko, O.

AU - Butenko, A.

AU - Donets, D. E.

AU - Donets, E. D.

AU - Donets, E. E.

AU - Eliseev, A.

AU - Fimushkin, V.

AU - Galimov, A.

AU - Karpinsky, V.

AU - Kekelidze, V.

AU - Khodzhibagiyan, H.

AU - Kobets, A.

AU - Meshkov, I.

AU - Monchinsky, V.

AU - Philippov, A.

AU - Rukoyatkina, T.

AU - Shurkhno, N.

AU - Slepnev, V.

AU - Slepnev, V.

AU - Sorin, A.

AU - Tuzikov, A.

AU - Vasilishin, B.

PY - 2012/12/1

Y1 - 2012/12/1

N2 - The Nuclotron upgrade - the Nuclotron-M project, was successfully completed in 2010. Following the project goals, Xe ions were accelerated to about 1.5 GeV/u in March 2010. In December 2010, the stable and safe operation of the power supply and energy evacuation system was achieved with a field in the lattice magnets of 2 T. In 2011 - 2012 three runs of the Nuclotron operation were carried out. The facility development is aimed to the performance increase for current physical program realization and to test equipment and operational modes of the NICA collider.

AB - The Nuclotron upgrade - the Nuclotron-M project, was successfully completed in 2010. Following the project goals, Xe ions were accelerated to about 1.5 GeV/u in March 2010. In December 2010, the stable and safe operation of the power supply and energy evacuation system was achieved with a field in the lattice magnets of 2 T. In 2011 - 2012 three runs of the Nuclotron operation were carried out. The facility development is aimed to the performance increase for current physical program realization and to test equipment and operational modes of the NICA collider.

UR - http://www.scopus.com/inward/record.url?scp=84890090807&partnerID=8YFLogxK

M3 - Paper

AN - SCOPUS:84890090807

SP - 117

EP - 119

T2 - 23rd Russian Particle Accelerator Conference, RuPAC 2012

Y2 - 24 September 2012 through 28 September 2012

ER -

ID: 38124191