• Irina Bogolyubova
  • Yulia Orel
  • Elena Rubtsova
  • Irina Zaitseva
  • Oleg Malafeyev
  • Alexander Popkov

In this article, the simplest dynamic synchronization model of a multi-storey production process is formalized and investigated, with which several quality functionals are associated. The method of idempotent analysis was used to study the model. The initial conditions for the production process are set, a production system with a specific number of employees and resources is set, taking into account time. To manage the production system, it is necessary to find a compromise solution. A numerical example is given in which a compromise point is found for the case of three quality functionals.

Original languageEnglish
Title of host publicationProceedings - 2021 3rd International Conference on Control Systems, Mathematical Modeling, Automation and Energy Efficiency, SUMMA 2021
PublisherInstitute of Electrical and Electronics Engineers Inc.
Pages19-22
Number of pages4
ISBN (Electronic)9781665439817
DOIs
StatePublished - 2021
Event3rd International Conference on Control Systems, Mathematical Modeling, Automation and Energy Efficiency, SUMMA 2021 - Lipetsk, Russian Federation
Duration: 10 Nov 202112 Nov 2021

Conference

Conference3rd International Conference on Control Systems, Mathematical Modeling, Automation and Energy Efficiency, SUMMA 2021
Country/TerritoryRussian Federation
CityLipetsk
Period10/11/2112/11/21

    Scopus subject areas

  • Artificial Intelligence
  • Energy Engineering and Power Technology
  • Computational Mechanics
  • Control and Systems Engineering
  • Industrial and Manufacturing Engineering
  • Safety, Risk, Reliability and Quality
  • Modelling and Simulation

    Research areas

  • compromise solution, labor resources, model, production system, synchronization

ID: 94061448