• В.К. Тютюкин
Article is devoted to solving the problem of finding an optimal schedule for robotic line. The novelty in this case is to replace the traditionally considered the straight route to the route of the robot with loops, which allows in many cases significantly reduce the duration of the production cycle. Found a solution arises in this auxiliary problem - the problem of marking numbers consisting in minimizing a function defined on combinations. This particular task scheduling theory, which is yet unique, highly specialized, can be used, and no doubt in other situations. The solution to this problem, as well as the construction of the optimal time schedules robotic lines illustrated with specific input data.
Translated title of the contributionOptimal route with loops for a robot on the production line
Original languageRussian
Title of host publicationМеждународный экономический симпозиум – 2015: Материалы Международных научных конференций, посвященных 75-летию экономического факультета Санкт-Петербургского университета 22-25 апреля 2015 г.
Subtitle of host publicationСборник статей
EditorsС.А. Белозеров, В.В. Иванов, Д.Н. Колесов
Place of PublicationСПб.
PublisherСкифия-принт
Pages304-316
ISBN (Print)978-5-98620-147-4
StatePublished - 2015
EventМеждународный экономический симпозиум – 2015 - ул. Таврическая, д. 21 - 2 5, Санкт-Петербург, Russian Federation
Duration: 21 Apr 201524 Apr 2015
http://www.econ.spbu.ru/science/conferences_and_seminars/InternationalSimposium.pdf
http://econ-conf.spbu.ru/materialy/2015.html

Conference

ConferenceМеждународный экономический симпозиум – 2015
Country/TerritoryRussian Federation
CityСанкт-Петербург
Period21/04/1524/04/15
Internet address

ID: 4740317