A vendor-purchaser economic lot-size problem with remanufacturing and deposit

G. Pishchulov, I. Dobos, B. Gobsch, N. Pakhomova, K. Richter

Результат исследований: Публикации в книгах, отчётах, сборниках, трудах конференцийстатья в сборнике

Язык оригиналане определен
Название основной публикацииA vendor-purchaser economic lot-size problem with Proceedings of the International Conference on Operations Research (OR 2011), Zurich, Switzerland, 30.8.–2.9.2011, Springer
ИздательSpringer
Страницы457 - 462
СостояниеОпубликовано - 2012
Опубликовано для внешнего пользованияДа

Цитировать

Pishchulov, G., Dobos, I., Gobsch, B., Pakhomova, N., & Richter, K. (2012). A vendor-purchaser economic lot-size problem with remanufacturing and deposit. В A vendor-purchaser economic lot-size problem with Proceedings of the International Conference on Operations Research (OR 2011), Zurich, Switzerland, 30.8.–2.9.2011, Springer (стр. 457 - 462). Springer.
Pishchulov, G. ; Dobos, I. ; Gobsch, B. ; Pakhomova, N. ; Richter, K. / A vendor-purchaser economic lot-size problem with remanufacturing and deposit. A vendor-purchaser economic lot-size problem with Proceedings of the International Conference on Operations Research (OR 2011), Zurich, Switzerland, 30.8.–2.9.2011, Springer. Springer, 2012. стр. 457 - 462
@inbook{85c4930e1c80436a92be7473674b7ced,
title = "A vendor-purchaser economic lot-size problem with remanufacturing and deposit",
author = "G. Pishchulov and I. Dobos and B. Gobsch and N. Pakhomova and K. Richter",
year = "2012",
language = "не определен",
pages = "457 -- 462",
booktitle = "A vendor-purchaser economic lot-size problem with Proceedings of the International Conference on Operations Research (OR 2011), Zurich, Switzerland, 30.8.–2.9.2011, Springer",
publisher = "Springer",
address = "Германия",

}

Pishchulov, G, Dobos, I, Gobsch, B, Pakhomova, N & Richter, K 2012, A vendor-purchaser economic lot-size problem with remanufacturing and deposit. в A vendor-purchaser economic lot-size problem with Proceedings of the International Conference on Operations Research (OR 2011), Zurich, Switzerland, 30.8.–2.9.2011, Springer. Springer, стр. 457 - 462.

A vendor-purchaser economic lot-size problem with remanufacturing and deposit. / Pishchulov, G.; Dobos, I.; Gobsch, B.; Pakhomova, N.; Richter, K.

A vendor-purchaser economic lot-size problem with Proceedings of the International Conference on Operations Research (OR 2011), Zurich, Switzerland, 30.8.–2.9.2011, Springer. Springer, 2012. стр. 457 - 462.

Результат исследований: Публикации в книгах, отчётах, сборниках, трудах конференцийстатья в сборнике

TY - CHAP

T1 - A vendor-purchaser economic lot-size problem with remanufacturing and deposit

AU - Pishchulov, G.

AU - Dobos, I.

AU - Gobsch, B.

AU - Pakhomova, N.

AU - Richter, K.

PY - 2012

Y1 - 2012

M3 - статья в сборнике

SP - 457

EP - 462

BT - A vendor-purchaser economic lot-size problem with Proceedings of the International Conference on Operations Research (OR 2011), Zurich, Switzerland, 30.8.–2.9.2011, Springer

PB - Springer

ER -

Pishchulov G, Dobos I, Gobsch B, Pakhomova N, Richter K. A vendor-purchaser economic lot-size problem with remanufacturing and deposit. В A vendor-purchaser economic lot-size problem with Proceedings of the International Conference on Operations Research (OR 2011), Zurich, Switzerland, 30.8.–2.9.2011, Springer. Springer. 2012. стр. 457 - 462